Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
5.5 MW
10 %
24 MWh
96.6 %
9 / 13
6
Wind
7.4 m/s ESE
Irradiance
0 W/m²
Temperature
14.5 °C
Cloud cover
32 %
Conditions
Sunny intervals
Substation
Ascó SE 400 kV
Voltage
399.7 kV
Frequency
49.987 Hz
Power factor
0.984
Curtailment
8 %
Day-ahead price
69.73 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
0.11 MW
Today
2.8 MWh
Wind
4.9 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
1.17 MW
Today
2.4 MWh
Wind
8.2 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
1.3 MWh
Wind
5.3 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
3.5 MWh
Wind
9.5 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.78 MW
Today
1.9 MWh
Wind
8.6 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
0.33 MW
Today
1.9 MWh
Wind
6.5 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
4.52 MW
Today
4.9 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
2.32 MW
Today
2.6 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded