IMM-12
RunningSumitomo Demag El-Exis SP 300 · 300 t clamp force · Oyonnax Plant
Last seen 02:43:48
All pressesDigital twin
Live machine view
Animated from live telemetry: cycle time, status and hopper level. Drag to rotate, scroll to zoom.
Running
Current job
cable gland
Mold
M-7519
Material
PBT
Cavities
16
Shot weight
11.9 g
Target cycle
12.5 s
Next maintenance
41d 22h
Process
Live process values
Cycle time
15.04s
Melt temp.
277°C
Mold temp.
64°C
Injection
1,307bar
Hold pressure
475bar
Hopper
54%full
Efficiency
OEE
63%
81.6%
Availability
84.0%
Performance
92.4%
Quality
Production
Today's output
10,437
shots of 17,625 planned · 166,992 parts
Scrap rate
1.73%
Scrap shots
181
Goal progress
59%
Shots per hour
Good and scrap shots today
Production day starts at 06:00.
Alarms
Alarms (1)
Short shot detected
2026-11-04 22:51
Process history
Cycle time, scrap and melt temperature
Cycle time · s (target 12.5 s)
Scrap · %
Melt temperature · °C