WP-3
WashingTrommel · MSI Mining T5x Trommel · 200 yd³/h rated · Dominion Creek
Last seen 02:44:34
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 7 · Bench 2
Frozen muck over gravel
Grade
0.031 oz/yd³
Rated capacity
200 yd³/h
Design water
2,000 gpm
Sluice slope
2.1 in/ft
Season runtime
1,562 h
Last cleanup
11-05 05:28
Next cleanup
in 10m 00s
Process
Live process values
Feed rate
153yd³/h
Process water
1,806gpm
Trommel
9.2rpm
Pump pressure
72psi
Hopper
86%full
Recovery rate
4.79oz/h
Recovery
Gold today
83.6 oz
84%
Yards goal
0.031
Grade
4.79
oz/h
Production
Yards washed today
2,668
yd³ of 3,176 planned · 16.8 h washing since 07:00
Average feed
159 yd³/h
Utilisation
79% of rated
Hours today
16.8 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (1)
Sluice flow below setpoint
2026-11-04 10:26
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 200)
Process water · gpm
Trommel · rpm