WP-3

Washing

Trommel · MSI Mining T5x Trommel · 200 yd³/h rated · Dominion Creek

Last seen 02:44:34

Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 7 · Bench 2
Frozen muck over gravel

Grade

0.031 oz/yd³

Rated capacity

200 yd³/h

Design water

2,000 gpm

Sluice slope

2.1 in/ft

Season runtime

1,562 h

Last cleanup

11-05 05:28

Next cleanup

in 10m 00s

Process
Live process values

Feed rate

153yd³/h

Process water

1,806gpm

Trommel

9.2rpm

Pump pressure

72psi

Hopper

86%full

Recovery rate

4.79oz/h
Recovery
Gold today
83.6 oz

84%

Yards goal

0.031

Grade

4.79

oz/h

Production
Yards washed today

2,668

yd³ of 3,176 planned · 16.8 h washing since 07:00

Average feed

159 yd³/h

Utilisation

79% of rated

Hours today

16.8 h

Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.

Yards · yd³

Gold · oz

Alarms
Alarms (1)

Sluice flow below setpoint

2026-11-04 10:26

High
Process history
Feed rate, process water and trommel speed

Feed rate · yd³/h (rated 200)

Process water · gpm

Trommel · rpm