EX-01

Working

Excavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek

Last seen 02:49:11

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro

Wash plant

s-scr-wp1

Hours today

9.8 h

Cycle time

34s

Cycles today

827

Engine hours

8,866 h

Next service

in 304 h

Telemetry
Live readings

Engine speed

1,779rpm

Coolant

92.9°C

Hydraulic oil

77.2°C

Hydraulic pressure

334bar

Bucket fill

100%

Fuel burn

62L/h
Fuel
Tank level
21%

209 L

In tank

62.0 L/h

Burn

3.4 h

Range

Utilisation
Hours on this shift

9.8 h

of a 12 h shift · 82% utilisation

Load

100%

Engine speed

1,779 rpm

Coolant

93 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %