WP-1
WashingDerocker · Oro Industries Derocker 350 · 300 yd³/h rated · Scroggie Creek
Last seen 02:45:44
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 13 · Bench 2
Frozen muck over gravel
Grade
0.012 oz/yd³
Rated capacity
300 yd³/h
Design water
3,000 gpm
Sluice slope
2.5 in/ft
Season runtime
924 h
Last cleanup
11-05 07:08
Next cleanup
in 4h 22m
Process
Live process values
Feed rate
184yd³/h
Process water
2,775gpm
Trommel
7.3rpm
Pump pressure
62psi
Hopper
86%full
Recovery rate
2.24oz/h
Recovery
Gold today
39.3 oz
84%
Yards goal
0.012
Grade
2.24
oz/h
Production
Yards washed today
3,231
yd³ of 3,846 planned · 16.8 h washing since 07:00
Average feed
192 yd³/h
Utilisation
64% of rated
Hours today
16.8 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (3)
Tailings stacker overload
2026-11-05 20:19
Sluice flow below setpoint
2026-11-05 13:41
Trommel drive overcurrent
2026-11-04 15:50
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 300)
Process water · gpm
Trommel · rpm