WP-2
WashingDerocker · Oro Industries Derocker 350 · 200 yd³/h rated · Sulphur Creek
Last seen 02:45:46
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 6 · Bench 2
Gravel and cobbles
Grade
0.022 oz/yd³
Rated capacity
200 yd³/h
Design water
2,000 gpm
Sluice slope
1.5 in/ft
Season runtime
1,470 h
Last cleanup
11-05 07:17
Next cleanup
in 16h 31m
Process
Live process values
Feed rate
146yd³/h
Process water
1,791gpm
Trommel
10.9rpm
Pump pressure
63psi
Hopper
86%full
Recovery rate
3.20oz/h
Recovery
Gold today
54.8 oz
84%
Yards goal
0.022
Grade
3.20
oz/h
Production
Yards washed today
2,503
yd³ of 2,980 planned · 16.8 h washing since 07:00
Average feed
149 yd³/h
Utilisation
74% of rated
Hours today
16.8 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (3)
Oversize chute blocked
2026-11-05 10:22
Nugget trap full
2026-11-04 19:27
Screen blinding detected
2026-11-04 15:10
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 200)
Process water · gpm
Trommel · rpm